Use runtime.GOMAXPROCS(0) as worker count for CPU-bound tasks,
repo.Connections() for IO-bound task and a combination if a task can be
both. Streaming packs is treated as IO-bound as adding more worker
cannot provide a speedup.
Typical IO-bound tasks are download / uploading / deleting files.
Decoding / Encoding / Verifying are usually CPU-bound. Several tasks are
a combination of both, e.g. for combined download and decode functions.
In the latter case add both limits together. As the backends have their
own concurrency limits restic still won't download more than
repo.Connections() files in parallel, but the additional workers can
decode already downloaded data in parallel.
Load tree blobs with more than 50MB only from a single goroutine. Very
large tree blobs with for example 400 MB size can otherwise require
roughly 1GB * streamTreeParallelism memory.